Back to Projects

Cincinnati Art Museum

The renovation freed up 13,000 SF of space within the main Art Museum building to display more works from the museum's 60,000 piece collection.
x
Cut new entrance into 125 year old stone wall.
x
Cleaned, patched, sealed and reinforced 125 year old stone exterior.
x
Constructed new 3-story structure inside existing stone perimeter. The stone was temporarily supported and reinforced during this process.

The Danis team did a very good job of coordinating all the work activities throughout the entire project. We dealt with many obstacles throughout the project and the Danis team remained professional through them all. They also showed an attention to detail that led to an aesthetically pleasing, high quality product in the end.

Harry Geimier - Director of Facilities
LOCATIONS & CONTACT
Your preferred location:
MIDWEST REGION
Cincinnati Area
Nick Hoyng
50 E-Business Way
Cincinnati, Ohio 45241
513.984.9696
 
Columbus Area
Dustin Rohrbach
2715 Tuller Parkway
Dublin, Ohio 43017
614.761.8385
 
Dayton Area
Troy Erbes
3233 Newmark Drive
Miamisburg, Ohio 45342
937.228.1225
CAROLINAS
Raleigh/Durham Area
Mark Moeller
5511 Capital Center Drive
Suite 100
Raleigh, NC 27606
919.468.6240
SOUTHEAST
Jacksonville Area
Gordon Steadman
10748 Deerwood Park Blvd South
Jacksonville, Florida 32256
904.724.6045
RECRUITING
All Regions
LuAnn Holscher
3233 Newmark Drive
Dayton, Ohio 45342
937.228.1225
hr@danis.com